A DYB is up and running, with me in two groups. It is a "Seams only", with embroidered seam treatments and spaces.
The blocks were posted on 1st February, and I have received the two blocks to be worked on.
These are now ready for the next turnover on 1st March.
No comments:
Post a Comment